Specs that punish underspec'd hardware
4K editorial, VFX, animation pipelines need workstation-grade memory, GPU, and fast storage. General-purpose laptops won't survive.
Industries
MacBook Pro Max, Precision and ZBook mobile workstations, render farms, colour-accurate Studio Displays, sized to the show, the season, or the project. Project-duration rental that matches how production budgets actually work.
What we hear from this industry
4K editorial, VFX, animation pipelines need workstation-grade memory, GPU, and fast storage. General-purpose laptops won't survive.
Show production runs 6–18 months and is budgeted as a P&L. IT lives on that P&L, not on multi-year capex.
Editorial, grading, and design need wide-gamut, factory-calibrated displays, not generic office monitors.
Crew scales with the production; equipment needs to match. Rent more in production, return when wrap completes.
The needEditorial and VFX team for a show, need workstation-grade kit for the production window.
Our solution
MacBook Pro, workstations, and high-end displays for design and dev workloads.
The needProduction wraps in 9 months, kit returned then.
Our solution
Scale up for a project, scale down when it ends. Pay only for what you use.
The needDistributed remote crew across cities working on the same show.
Our solution
Deliver pre-configured devices to homes across India in days, not weeks.
Step 1
Understand your fleet, locations, compliance requirements, and refresh constraints, sector-specific.
Step 2
Hardware, services, schedule, commercials, shaped to industry norms and regulatory needs.
Step 3
Imaging, security baseline, compliance hooks (where needed). Lab-tested before dispatch.
Step 4
Multi-city dispatch, onsite handover where required. Sector-specific delivery cadence.
Step 5
Replacement SLAs, refresh windows, end-of-term wipe and disposal, with audit trail where required.
Step 1
Understand your fleet, locations, compliance requirements, and refresh constraints, sector-specific.
Step 2
Hardware, services, schedule, commercials, shaped to industry norms and regulatory needs.
Step 3
Imaging, security baseline, compliance hooks (where needed). Lab-tested before dispatch.
Step 4
Multi-city dispatch, onsite handover where required. Sector-specific delivery cadence.
Step 5
Replacement SLAs, refresh windows, end-of-term wipe and disposal, with audit trail where required.
Tell us the show, the team, the timeline, proposal in 30 minutes.